Poured concrete walls
After the footers are in place, usually the next day, the wall crew moves onto
the job site. Using boom-equipped trucks, they unload the aluminum form
panels and begin "setting the walls".
SOLID FOUNDATIONS INC. - Your Complete Poured Foundation Contractor
Copyright © 2007 Solid Foundations Inc.
|
Once the walls are "set" and the concrete trucks are on their way, the pump
truck is moved into place (as needed) and the crew prepares to pour the walls.
Once the walls are poured and sit until hard (usually overnight), the form
panels are stripped from the wall, reloaded on the boom trucks, and ready to
be hauled away.
An outside "Bilco" entrance can be added as needed. This is
decided upon during the design process.